Supplemental Bid Bulletin No. 24-10
For the Procurement of Supply and Delivery of Distribution Transformers (PB-ITB-R8-2-2024)
SBB NO. 24-10_PB-ITB-R8-2-2024(Download pdf)
Supplemental Bid Bulletin No. 24-10
For the Procurement of Supply and Delivery of Distribution Transformers (PB-ITB-R8-2-2024)
SBB NO. 24-10_PB-ITB-R8-2-2024(Download pdf)
Supplemental Bid Bulletin No. 24-09
For the Procurement of Consignment, Supply and Delivery of KWh Meters (PB-ITB-R8-1-2024)
SBB NO. 24-09_PB-ITB-R8-1-2024 (Download pdf)
Regional Procurement Hub Program- Region 8
Supplemental Bid Bulletin No. 24-08 for the Procurement of Consignment, Supply and Delivery of Distribution Transformers
(PB-ITB-R8-2-2024)
Please click link for further details. Thank you
The Region 8 Electric Cooperatives together with the RENAGMEC Power Corporation invite interested BIDDERS to submit sealed bids for the Supply and Delivery of Conductors and Steel Poles.
Please see attached INVITATION TO BID Region 8 RPH Public Bidding No.3 and No. 4 for full details.
Sealed Eligibility Requirements and Bid Proposals must be submitted to;
JULIO H. COLINA Chairperson, NEA SBAC Secretariat National Electrification Administration NEA BAC Office, 3rd Floor, NEA Building, #57 NIA Road, Diliman, Quezon City, Metro Manila Email Address: nearph2024@gmail.com Contact Number: 8929-19-09; local: 3138, on or before 10 September 2024, 1:30 P.M. During the Bid Opening (03 September 2024, 8:00 A.M.), said envelopes for Eligibility Requirements and Bid Proposals will be opened and read in the presence of the bidder’s authorized representative. Late bids shall not be accepted.
R8 RPH ITB Conductors (PB-ITB-R8-4-2024) FIN R8 RPH ITB Steel Poles (PB-ITB-R8-3-2024) FINR8 RPH ITB Steel Poles (PB-ITB-R8-3-2024) FIN
The Region 8 Electric Cooperatives together with the RENAGMEC Power Corporation invite interested bidders to submit sealed bids for the Supply and Delivery of Kwh Meters.
Please see attached INVITATION TO BID Region 8 RPH Public Bidding No.1 and No. 2 for full details.
Sealed Eligibility Requirements and Bid Proposals must be submitted to;
JULIO H. COLINA Chairperson, NEA SBAC Secretariat National Electrification Administration NEA BAC Office, 3rd Floor, NEA Building, #57 NIA Road, Diliman, Quezon City, Metro Manila Email Address: nearph2024@gmail.com Contact Number: 8929-19-09; local: 3138, on or before 03 September 2024, 7:30 A.M. During the Bid Opening (03 September 2024, 8:00 A.M.), said envelopes for Eligibility Requirements and Bid Proposals will be opened and read in the presence of the bidder’s authorized representative. Late bids shall not be accepted.
Minutes of the 47th Annual General Membership Assembly (AGMA) and 4th State of the Electric Cooperative Address (SECA) of the Don Orestes Romualdez Electric Cooperative, Inc. (DORELCO) also known as Leyte 1 Electric Cooperative, Inc. (LEYECO 1 ) on August 5, 2023 at the DORELCO MCO Auditorium, Brgy. San Roque. Tolosa, Leyte and broadcasted live over the DORELCO Facebook Page.
DORELCO 47TH AGMA MINUTES -2023 (Download)
Breakdown of Generation Charge for the Month of July 2024

EPSON MFP image
DORELCO Power Rate up in July
DORELCO residential consumers are facing an uptick in power rates totaling to Php 16.4521 per kilowatt-hour for July billing which primarily attributed to a significant surge in the generation charge imposed by power suppliers.
NGCP’s Transmission Charge lower down to 0.9183 per kwhr for this month.
While DORELCO’s distribution charge of Php 2.0750, which covers the expenses associated with transmitting electricity from the point of generation to homes, has remained unchanged.
However, the substantial rise in the generation charge has overshadowed this static distribution cost, resulting in an overall increase in the electricity bill for consumers.

CSP Activity/Stage: Opening of Bids
Date: June 25 & 26, 2024
Time: 9:30 AM
Venue: Summit Hotel, Robinsons Place, Barangay 77 Marasbaras, Tacloban City, Leyte