PROCUREMENT FOR THE SUPPLY AND DELIVERY OF THE 2025 RPH STEEL POLE REQUIREMENTS OF THE MEMBER ELECTRIC COOPERATIVES OF REGION EIGHT
(PB-ITB-R8-3-2024)
Notice of Award – STEEL POLE (download pdf)
PROCUREMENT FOR THE SUPPLY AND DELIVERY OF THE 2025 RPH STEEL POLE REQUIREMENTS OF THE MEMBER ELECTRIC COOPERATIVES OF REGION EIGHT
(PB-ITB-R8-3-2024)
Notice of Award – STEEL POLE (download pdf)
REGIONAL PROCUREMENT HUB PROGRAM – REGION 8
SUPPLEMENTAL BID BULLETIN NO. 24-13 FOR THE
PROCUREMENT OF CONSIGNMENT, SUPPLY AND DELIVERY OF DISTRIBUTION TRANSFORMERS
(PB-ITB-R8-2-2024)
(REBIDDING)
Bid Bulletin No. 24-13 for Region 8 2025 Distribution Transformer Requirements (PB-ITB-R8-2-2024) (Rebidding) (download pdf)
Region 8 RPH Public Bidding No. 2
Series of 2024
(Rebidding)
Procurement of Consignment, Supply and Delivery of Distribution Transformers
PB-ITB-R8-2-2024 Rebidding (Download pdf)

SUPPLEMENTAL BID BULLETIN NO. 24-11
FOR THE PROCUREMENT OF SUPPLY AND DELIVERY OF STEEL POLES
(PB-ITB-R8-3-2024)
RPH SBB No. 2024-11 for PB-ITB-R8-3-2024 (Download pdf)
POWER RATE ADVISORY to our Valued Member Consumer-Owners.
The overall power rate for the month of AUGUST 2024 has reduced to Php 13.9479 per kilowatt hour for Residential Consumers.
The reduction is due to the decrease in GENERATION CHARGE- this is the rate of power suppliers of DORELCO which reached Php 7.7457 per kwhr.
However, the TRANSMISSION CHARGE of the NGCP has increased to 1.0088 per kwhr.
These are pass-on charges that are part of our Power Rate, DORELCO only collects this charges to its MCOs and remits it back to the power suppliers and to the NGCP.
DORELCO’s DISTRIBUTION CHARGE remains at Php 2.0750. It has not increased since 2010.

Title: R8 JCPSP NOTICE OF AWARD
CSP Activity/Stage: Notice of Award
Date: August 19, 2024
R8-JCPSP_Notice-of-Award-for-Lot-2-TLI (Download pdf)
Title: R8 JCPSP NOTICE OF AWARD
CSP Activity/Stage: Notice of Award
Date: August 19, 2024
R8-JCPSP_Notice-of-Award-for-Lot-1-TLI-SPI-KSPC (Download pdf)

EPSON MFP image